Please read these terms and conditions carefully before accepting estimates, scheduling electrical contracting work, or utilizing our customer portal services in New York City.
Last Updated: October 28, 2026•NYC Licensed Master Electrician•DOB & Con Edison Standards
1. Agreement & Scope of Work
These Terms and Conditions constitute a legally binding agreement between AGG Controls Electric Corp. ("Contractor", "we", "our", or "us"), operating as a NYC Licensed Master Electrician, and the customer ("Client", "Customer", or "you").
The scope of services encompasses commercial, industrial, institutional, and high-density residential electrical construction, power distribution switchboards, transformer rigging, panel upgrades, PLC automation systems, DOB code violation remediations, and Con Edison utility connections as itemized in the approved estimate or proposal.
2. Estimates, Deposits & Approvals
All written estimates provided through our customer portal, email, or in-person delivery are valid for thirty (30) calendar days from issuance, unless otherwise stated in writing, due to fluctuating copper, conduit, and switchgear raw material markets.
Deposit Requirement: Prior to mobilization, procurement of custom equipment, or permit filings, the required deposit specified on the proposal (typically 20% to 50%) must be remitted.
Digital Acceptance: Approving an estimate through our client portal, signing a physical work authorization, or remitting the required deposit confirms your agreement to these terms.
3. NYC DOB & Con Edison Permits
All electrical installations requiring municipal oversight will be filed under our NYC Master Electrician License with the NYC Department of Buildings (DOB) and Consolidated Edison (Con Edison).
The Customer agrees to execute all required owner-authorization affidavits, utility letters, and property ownership documentation necessary for permit filings. Contractor is not liable for municipal review backlogs, utility service cutover delays, or DOB inspection scheduling backlogs beyond our direct operational control.
4. Site Access & Working Hours
Standard electrical contracting hours are Monday through Friday, 8:00 AM to 6:00 PM, excluding legal holidays. Saturday or off-hour work may be scheduled by mutual appointment and may be subject to prevailing wage or off-hour differential labor rates.
The Customer must ensure clear, unobstructed, safe access to service entrance rooms, electrical panels, meters, risers, and utility points of connection. Unreasonable site delays caused by locked facilities or inaccessible areas may incur waiting time charges.
5. Change Orders & Concealed Conditions
Estimates are based on visible site inspections and provided engineering drawings. If unforeseen or concealed existing conditions are encountered—such as degraded knob-and-tube wiring, ungrounded feeder risers, non-code compliant prior contractor work, asbestos insulation, or structural obstructions—Contractor will halt affected work and issue a written Change Order itemizing the required corrective labor and materials.
Any alterations, additional circuits, or scope modifications requested by the Customer must be approved in writing before execution.
6. Payments, Invoicing & Late Fees
Invoices are due upon receipt or in accordance with the milestone payment schedule specified in the agreement. We accept online card payments, ACH electronic transfers, certified corporate checks, and financing/EMI plans when authorized.
• Invoices remaining unpaid thirty (30) days past their due date shall accrue interest at the rate of 1.5% per month (18% per annum) or the maximum statutory rate allowed under New York law.
• If collection efforts or legal counsel become necessary due to customer non-payment, the Customer agrees to pay all reasonable attorney fees, court fees, and collection costs incurred by Contractor.
7. Workmanship Warranty & Limitation of Liability
One-Year Workmanship Warranty: AGG Controls Electric Corp. guarantees all electrical installation workmanship against defects for a period of one (1) year from the date of final electrical inspection or substantial project completion.
Equipment, switchboards, circuit breakers, lighting fixtures, and automation hardware are covered solely by their respective manufacturer warranties. This warranty does not cover damage caused by utility voltage surges, brownouts, floods, tampering, acts of God, or modifications performed by third parties.
Limitation of Liability: To the fullest extent permitted under New York State law, Contractor's total aggregate liability arising out of any contract or electrical installation shall not exceed the total compensation paid by Customer under that specific contract. Contractor is not liable for indirect, incidental, special, or consequential damages.
8. Governing Law & Contact
These terms shall be governed by and construed in accordance with the laws of the State of New York. Any legal dispute, claim, or proceeding arising hereunder shall be filed exclusively in the courts situated in Queens County, City of New York.
AGG Controls Electric Corp.NYC Licensed Master Electrician